Home Services Metal Framing

Metal Framing

Overview

Metal framing for multi-residential and commercial builds

Light-gauge steel framing is the non-load-bearing skeleton behind some interior walls and ceilings in multi-residential and commercial buildings, and increasingly in the basements, bulkheads and feature ceilings of custom homes. Studs snap into track, channel hangs from the structure above, and every member is the same size and perfectly straight out of the bundle.

CNG frames interior partitions, demising walls, shaft walls, bulkheads, drop ceilings and furring in steel across the Greater Toronto Area, then insulates and boards them with our own crews so the schedule has one name on it.

Studs and channel

Partitions vs ceiling systems

Two families of steel framing that show up on nearly every job. Studs and track build the walls; channel and furring build the ceilings and straighten what the structure left uneven.

Studs & track · 25 and 20 gauge · 1-5/8 in to 6 in

Steel stud partitions

C-shaped studs friction-fit into top and bottom track at 16 inches on centre, with 20-gauge members at door jambs, corners and anywhere cabinets will hang. Slip track at the head lets the slab above deflect without cracking the wall, which is why multi-residential specs call for it.

  • Interior partitions in multi-residential and commercial
  • Demising and corridor walls, rated to one and two hours
  • Basement partitions in custom homes
  • Curved and radius walls
  • Shaft walls and chase walls
Furring & channel · Hat channel and resilient channel

Ceiling systems and furring

Hat channel screwed to the underside of joists or hung from carrying channel on wire to bring a ceiling dead level, and to drop it for services. Furring channel on strapping clips straightens masonry and concrete walls for board. Resilient channel decouples a ceiling or wall for sound.

  • Level drywall ceilings under uneven joists
  • Drop ceilings and bulkheads around ducts and beams
  • Furring on foundation and block walls
  • Resilient channel for sound-rated assemblies
  • Feature ceilings and drops with steel framing
Our metal framing work
Our metal framing work, Mill St, Georgetown
Mill St, Georgetown
Our metal framing work, Grandvista Cres, Vaughan
Grandvista Cres, Vaughan
Our metal framing work, Mill St, Georgetown
Mill St, Georgetown
Our metal framing work, Grandvista Cres, Vaughan
Grandvista Cres, Vaughan
Our metal framing work, Mill St, Georgetown
Mill St, Georgetown
Our metal framing work, Lorraine Dr, North York
Lorraine Dr, North York
Our metal framing work, Grandvista Cres, Vaughan
Grandvista Cres, Vaughan
Our metal framing work, Mill St, Georgetown
Mill St, Georgetown
Our metal framing work, Lorraine Dr, North York
Lorraine Dr, North York
Our metal framing work, Grandvista Cres, Vaughan
Grandvista Cres, Vaughan
Our metal framing work, Mill St, Georgetown
Mill St, Georgetown
By the numbers

Metal framing

25 gastandard non-load-bearing stud for partitions and ceilings
20 gaheavier stud at jambs, corners and behind cabinetry
16 inon-centre stud spacing for partitions and furring
1-5/8 into 6 in: stud widths, most often 3-5/8 in, sized to the wall and the services in it
1 hr / 2 hrfire-rated partition assemblies we build from listed designs
1/8 inin 10 ft: our alignment tolerance for framing under board
Applications

Where we install metal framing

Interior partitions in multi-residential
Demising walls between units
Corridor, stair and shaft walls
Bulkheads around ducts, beams and plumbing
Level drywall ceilings on channel
Drop ceilings and light coves
Furring on concrete and block walls
Basement partitions in custom homes
Curved walls and feature ceilings
Why builders choose steel

What metal framing does for the build

  • Dead straight, and it stays that way. No crowns, no twists, no shrinkage. The wall is flat when we board it and flat when the painter arrives, which is what a Level 5 finish depends on.
  • Faster on the floor. Track snaps to the layout line, studs stand in it, screws hold it. A crew frames a multi-residential floor plate in steel in a fraction of the time wood takes, with no cutting to length and far less waste.
  • Non-combustible and rated. Steel framing carries the one- and two-hour listings that party walls, corridors and shafts need, and it does not add fuel to a fire the way wood does.
  • Right for basements. Steel does not rot, swell or feed mould against a damp foundation wall, so it is the framing for below-grade partitions and furring in a custom home.
  • Built for movement. Slip track at the head lets a concrete slab deflect without loading the partition, and the wall stays uncracked. It is standard on our multi-residential work.
  • One crew from track to tape. We frame it, insulate it, board it and finish it. Bulkheads, furring and channel for sound all get done by the people who know where the board goes.
Common questions

Metal Framing FAQ

Steel or wood for interior partitions?

Steel for multi-residential and commercial, where speed, fire ratings, straightness and deflection heads all favour it. Steel for basements in custom homes, where wood would sit against a damp wall. Wood remains common above grade in a custom home where the structural framer is already on site. We work in both and will frame each wall in whichever the drawings and the budget call for.

Do you do load-bearing steel?

No. We frame non-load-bearing light-gauge partitions, ceilings and furring. Structural steel and load-bearing cold-formed steel are the structural engineer’s and the structural framer’s scope.

Do steel studs make the wall colder or noisier?

Interior partitions are not part of the thermal envelope, so no. Where steel studs do land in an exterior wall, the assembly needs continuous exterior insulation to avoid thermal bridging, which is part of our rigid foam scope. For sound, a steel stud wall with mineral wool and resilient channel performs as well as or better than wood.

How do you coordinate with mechanical and electrical?

We frame from the reflected ceiling plan and the mechanical drawings, set bulkheads to the duct sizes actually installed, and walk the floor with the other trades before board. Chases and access panels get framed where they are needed rather than cut in later.

Where we work

Proudly serving the GTA
& surrounding areas